In accordance with the provisions of the Massachusetts State Building Code, 780 CMR 51.00, Section 5110.4 and 5114.2, the total estimated cost of the construction including all related construction costs of the building listed on this form amounts to a total that is noted and notarized.
In accordance with the provisions of the Massachusetts State Building Code, 780 CMR 51.00, Section 5110.4 and 5114.2, the total estimated cost of the construction including all related construction costs of the building listed on this form amounts to a total that is noted and notarized.